Te Aponga Uira - final waste-to-energy feasibility study

This report presents the findings of a feasibility study of a Waste to Energy Plant for Rarotonga. The research and analysis that supports this report was conducted by KEMA in 2012.

This report does not address or analyze the adequacy of any future renewable energy projects; such matters are the exclusive responsibility of the developer and owner. Moreover, this report is based upon certain assumptions and sample cases, and it is therefore intended to be advisory but not all-inclusive as to events and scenarios which could arise in reality. In no event should this report be relied upon as a guarantee of any performance results of any scenarios used here.

Sorry! This document can only be viewed by Bioenergy Association members.
Please log in to view it:

User login

To prevent automated spam submissions leave this field empty.